PRELIMINARY PROPORTIONING · EUROPE

Build a trial mixture without pretending the calculator is a conformity checker.

Select the concrete context, enter the project limits you have actually verified, and inspect how water, cement and aggregates close the volume balance. If a project limit is left blank, the calculator does not invent one.

EN 206 context · national provisions apply
i

How to use this responsibly: exposure class is recorded for context only. The calculator does not automatically assign a code maximum w/c or minimum cement content. Enter those values only when you have confirmed them from the current national/project requirements.

01

Concrete requirements & verified limits

Separate the concrete description from the limits that actually control the project.

02

Material properties & water reduction

Use current supplier/laboratory values where available; defaults are only starting values.

WHAT THIS TOOL DOES NOT DO

No automatic EN 206 conformity claim.

The tool deliberately leaves national/project composition limits to the user because those requirements depend on the applicable implementation, constituent system and specification.