FULL CALCULATOR

IS 10262:2019 Concrete Mix Design

Preliminary proportioning for 1 m³. Enter the project requirements and material properties to calculate a transparent preliminary mix for 1 m³. Every major step is shown so you can check the result.

2019 edition
Engineering scope: defaults to the current IS 10262:2019 method (switch to 2009 legacy in the Standard field). Results are for preliminary proportioning and trial batches. Durability limits come from IS 456 — pick an exposure condition to fill them, or enter your own.
01

Design requirements

These choices drive the calculation.

02

Materials & grading

Reference values change when aggregate size or sand zone changes.

03

Admixtures / SCM

Use measured/trial water-reduction performance where available.

04

See the paid report before you buy

The example below is the preloaded M40 benchmark report. A watermark is applied to the preview; your paid report is generated from your own calculation.

Watermarked preview of the M40 detailed calculation report
Detailed calculation report preview
Watermarked preview of the M40 trial mix sheet
Trial Mix Sheet preview